|Concrete pump|Hyundai Everdigm Concrete Pump Boom – ECP45CX – 2022 #1063

Hyundai Everdigm Concrete Pump Boom - ECP45CX - 2022 #1063

  • Chassis Type:

    Hyundai HD320

  • Hydraulic System:

    FFH Closed-loop hydraulic

  • Main Pump (two coaxial pumps):

    A4VG125HD x 2

  • Max. horizontal reach:

    37.5 m

  • Max. vertical reach:

    42.1 m

  • Concrete Output:

    160 m3/h

  • Concrete Pressure:

    85 bar

  • Emission Standard:

    Euro 4

  • Year of Manufacture:

    2022 - 2023

  • Country of Manufacture:

    South Korea

  • Location:

    Da Nang

  • Condition:

    New, unused machine

BOOM & PUMP SPECIFICATIONS

*Maximum value calculated according to theory

Boom

  • Folding type

    5 sections - ZR-fold type

  • Max. vertical reach

    42.1 m

  • Max. horizontal reach

    37.5 m

  • Max. depth reach

    29.1 m

  • Minimum Unfolding Height

    8.3 m

  • Boom Slewing Angle

    360 degrees

  • End Hose Length

    3 m

  • Delivery Pipe Diameter

    125 mm

Pump

  • Pump Configuration

    2116

  • Hydraulic System

    FFH Closed-loop hydraulic

  • Main Pump (2 coaxial pumps)

    A4VG125HD x 2

  • Concrete Cylinder

    230 x 2.100 mm

  • Number of Strokes*

    30 strokes/min

  • Concrete Output*

    160 m3/h

  • Concrete Pressure*

    85 bar

  • S Valve Type

    S Valve, S2318 (D.230 - 180mm)

  • Hopper Capacity (lit)

    600 l

Utilities Image

Gallery

Utilities
Images

Powerful Hyundai HD260 chassis

Wood-paneled cabin, power windows, extended cabin space (double cabin)

Premium air suspension seat for comfortable operation

Electric cabin lift

Tubeless tires

Euro 4 emission standard, exhaust gas recirculation engine – double combustion, no Adblue solution required

FFH closed-loop hydraulic system – Germany, efficient and economical

STIEBEL pump gearbox – Germany

HAWE boom control valve block – Germany

REXROTH brand hydraulic pump system – Germany

Main pump: 02 BOSCH REXROTH brand coaxial pumps – Germany

Module-type electrical control box, equipped with a display screen showing equipment operating status

REXROTH slewing reducer and motor – Germany

New type high-pressure swing cylinder

Vehicle cleaning water pump system

Water pump (30 bar)

Water tank (400 liters)

High-pressure spray nozzle (15m)

Improved boom slewing pillar design. Increases balance, load-bearing capacity, and more even force distribution during operation

Working lights are arranged in necessary areas

High-quality double-layer pipe, standard service life of 100,000m3 concrete

Auxiliary manual greasing system. LINCOLN automatic greasing system – Germany

Pump pipe holder on the rear outrigger beam

Side guard according to Ministry of Transport standards

New generation HBC wireless remote control set – Germany

Aluminum alloy floor (anti-slip, anti-rust)

Spirit level for equipment balancing

Newly designed hopper, prevents concrete clogging. Two hydraulic agitator motors on both sides

High-durability tail pipe #1, with cleaning ball access hole

High-quality boom manufacturing steel system Japan-Austria DIN STE890 (Europe)

Durable, lightweight, and aesthetically pleasing Composite hopper cover

Single-lip pump seal

S Valve S2318 – Large opening (Prevents stone clogging)

Wear ring – Tungsten Carbide wear plate, high durability

Chrome-plated Concrete Cylinder (High durability)

Double-layer reducing pipe (150 – 125mm)

HAWE anti-drop valve for outriggers – Germany

View more
View more
Utilities Image

Contact for Advisory Services

    Contact for Advice

      Showroom Tour

        Popup Showroom Image

        Price Request